News


BIM Stage 2 Re-Verification

BIM Stage 2 Re-Verification


At Wallace Whittle, we are committed to delivering excellence in both our products and our services, ensuring the highest quality.

Our BIM verification process is one of the many ways we demonstrate our in-house capability to successfully deliver BIM Stage 2 projects, which fully align with the RIBA stages and industry best practices.

We’re proud to share that we’ve successfully completed our BIM Stage 2 Verification Audit, conducted by BSI (British Standards Institution), for our ninth consecutive year! 

This latest audit, carried out on Tues 29th & Weds 30th April, reinforces our ongoing commitment to quality assurance, standardisation, and the effective implementation of BIM processes. It serves as a vital benchmark of our ability to meet industry standards and deliver high-quality outcomes through virtual construction. 

The audit reviewed multiple projects across Wallace Whittle, confirming our compliance with BIM protocols and the strength of our internal standards. Our skilled digital engineers apply BIM from the earliest concept stages, enabling us to visualise design intent and make data-driven decisions. Using a robust suite of in-house standards alongside advanced BIM authoring tools, we develop our designs in a 3D environment, facilitating seamless collaboration with our design partners and ensuring efficient information exchange. 

This integrated approach allows our designs to transition smoothly into the construction phase, supporting offsite project management, reducing on-site rework, and minimising material waste. By embedding data into our models from the outset, we empower our clients with the tools to build progressive operational datasets, laying the groundwork for comprehensive digital asset management and a full project audit trail. 

Over the two-day audit, the auditor demonstrated meticulous attention to detail, thoroughly reviewing evidence to confirm the consistent implementation of our BIM processes across multiple projects. The feedback was overwhelmingly positive, particularly highlighting the strength of our BIM Standards, and the clarity of our process documentation. 

Paul Hargreaves, Associate Director & Academy Manager, Paul Underhill, Associate BIM Technician, and Andrew Masson, Senior BIM Technician, were instrumental in the success of the audit, which was overseen by Raymond Kelly, our Quality and Standardisation Manager & Associate Director. Their deep understanding of our systems and processes, along with their ability to efficiently guide the auditor to relevant evidence, played a key role in achieving such a positive outcome. 

“Our processes are the principles on which the successful delivery of our projects is based. For an external auditor to review our documentation & project delivery and pass us for this accreditation is testament to the hard work of our project teams in operating in line with the ISO19650 industry standard.” Paul Underhill shared. 

Wallace Whittle has once again achieved BIM Stage 2 re-verification, marking another successful year of upholding our commitment to quality. 

This accomplishment reflects the collective effort of our entire team and underscores our commitment to maintaining high standards, delivering quality outcomes, and consistently applying BIM processes with precision across all projects. 

“Achieving BIM Re-Verification following the 2-day Audit by BSI once again demonstrates our commitment to delivering quality of product, quality of service, standardisation, and consistency across all aspects of the business. A lot of credit must go to our BIM leads, Andrew and Paul, who demonstrated to the auditor how effectively we’re applying these processes in practice.” shared Raymond Kelly.


To learn more about our BIM processes or industry accreditations, reach out to Raymond Kelly our Quality & Standardisation Manager at [email protected]