Dublin Airport Central | Engineering Consultants | Wallace Whittle

Dublin Airport Central


Client

Dublin Airport Authority

Project Value

€48M

Construction Dates

2018 – 2019

Dublin Airport Central

Dublin Airport Central DAC1

This €48M commercial campus situated within Dublin airport complex, included the new build of 200,000f2 of highly sustainable Grade A office space spread, over two six storey buildings.  The offices achieved LEED Gold Rating, Platinum Wired Score Rating, a highly energy efficient BER ‘A3’ rating and the entire project was managed and delivered to BIM L2.  We also undertook the design of infrastructure and the site wide urban realm, including architectural exterior lighting, creating a safe and pleasant ambience.

Start your project

Contact NowView Projects
Wallace Whittle
Aberdeen

1 Marischal Square
Broad Street, Aberdeen
AB10 1BL

Leeds

Clockwise -Yorkshire House
Greek Street
Leeds, LS1 5SH

Belfast

1 Hill Street
Belfast
BT1 2LA

London

2-6 Boundary Row
London
SE1 8HP

Birmingham

81 Colmore Row
Birmingham
B3 2BA

Manchester

53 King Street
Manchester
M2 4LQ

Edinburgh

38 Thistle Street
Edinburgh
EH2 1EN

Warrington

Suite F, Chadwick House
Birchwood Park
Warrington, WA3 6AE

Glasgow

The Garment Factory
10 Montrose Street
Glasgow, G1 1RE

Contact

Email Us
+44 (0)330 460 5200
Privacy Policy

Privacy Preference Center