CFD Study for Monklands Replacement Hospital - Wallace Whittle

News


CFD Study for Monklands Replacement Hospital

CFD Study for Monklands Replacement Hospital


The heating solution for the Monklands Replacement Hospital project, of which we are providing M&E design and Sustainability consultancy, is using air source heat pumps (ASHP) located on the roof of the energy centre for the development.

To get a little technical, the ASHP are generating circa 16MW of heat, which we understand to be the largest array of units currently being designed in the UK. With the discharge air from the ASHP being around 7°C below the ambient temperature, we had concerns with regard to the micro-climate that would be generated around the ASHP and the possibility of re-circulation across the heat pumps which reduces the efficiency of the installation.

We commissioned a Computational Fluid Dynamics (CFD) study, working in collaboration with JG Consulting, to test design to achieve the optimum layout based on varying ambient temperatures, wind speeds from various directions as well as taking account of the impact of the adjacent buildings.

The study is ongoing but the initial findings are being honed to create the optimum configuration.


Get in touch with us today to discuss your next Healthcare project – [email protected]

Wallace Whittle
Aberdeen

1 Marischal Square
Broad Street, Aberdeen
AB10 1BL

Leeds

Clockwise -Yorkshire House
Greek Street
Leeds, LS1 5SH

Belfast

1 Hill Street
Belfast
BT1 2LA

London

2-6 Boundary Row
London
SE1 8HP

Birmingham

81 Colmore Row
Birmingham
B3 2BA

Manchester

53 King Street
Manchester
M2 4LQ

Edinburgh

38 Thistle Street
Edinburgh
EH2 1EN

Warrington

Suite F, Chadwick House
Birchwood Park
Warrington, WA3 6AE

Glasgow

The Garment Factory
10 Montrose Street
Glasgow, G1 1RE

Contact

Email Us
+44 (0)330 460 5200
Privacy Policy

Privacy Preference Center